Tarneit Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Pre-Handover (PCI) Inspections in Tarneit

Pre-handover (PCI) inspections in Tarneit: the last point where your builder must fix defects before you take the keys and your warranty clock starts. Tarneit PCI reports typically run 40 to 120 items.

  • Report within 24 hours
  • 40 to 120 items on a typical build
  • Checked against the VBA Guide
  • Numbered list for your site supervisor
  • Reinspection available before settlement
  • Thermal camera and moisture meter
  • Drone roof check where needed
  • On site in Tarneit most weeks
Get your Tarneit inspection priceInstant price. No obligation. Same-week bookings.

Fully licensed & accredited

What is included

What is included in a Tarneit pre-handover (PCI) inspection

A visual practical completion inspection against the National Construction Code, the VBA Guide to Standards and Tolerances 2015 and your contract drawings, specification and selections. Every accessible room, external elevation, the roof where safely accessible, and the site.

Walls, ceilings and paint

  • Coverage, runs and colour variation
  • Joints, nail pops and sanding
  • Cornices, skirtings and architraves
  • Flatness against the Guide

Doors and windows

  • Fit, binding and closing action
  • Hardware installed and operating
  • Flyscreens and weather seals
  • Glazing damage and labels

Wet areas and tiling

  • Falls to waste, checked with a level
  • Silicone at wall and hob junctions
  • Tile lippage, spacing and grout
  • Screens, seals and floor wastes

Kitchen and cabinetry

  • Doors and drawers aligned
  • Benchtops, joins and edges
  • Splashback fit and sealing
  • Appliances installed undamaged

Roof and gutters

  • Tiles or sheeting seated and fixed
  • Ridge, valleys and flashings
  • Gutters and downpipes to stormwater
  • Roof space where safely accessible

External walls

  • Brickwork, mortar and weep holes
  • Render and control joints
  • Cladding fixing and sealing
  • Slab edge and inspection zone

Garage and driveway

  • Door installed and sealed
  • Slab falls and water entry
  • Driveway, paths and crossover
  • Paving against the damp course

Site and drainage

  • Stormwater pits and discharge
  • Falls away from the building
  • Ponding and exposed fill
  • Fencing, gates and site clean

Contract and handover

  • Inclusions built as specified
  • Variations completed
  • Certificates available
  • A numbered defect list for the builder

36 checkpoints across 9 areas on a standard Tarneit pre-handover (PCI) inspection. Areas that are not readily accessible on the day are listed in the report.

Sample findings

Sample defects found during our pre-handover (PCI) inspections in Tarneit

Findings from Owner Inspections pre-handover (PCI) inspections in Tarneit. Captions are the inspector's own wording from the report. Client addresses withheld.

Gas pipe left uncapped and open to site debris, found during a pre-handover inspection in Tarneit
Gas pipe left uncapped and open to site debris
Caulking left incomplete along the joint, found during a pre-handover inspection in Tarneit
Caulking left incomplete along the joint
Floor to skirting joint left uncaulked, found during a pre-handover inspection in Tarneit
Floor to skirting joint left uncaulked
Damaged garage slab surface that will spall once cars use it, found during a pre-handover inspection in Tarneit
Damaged garage slab surface that will spall once cars use it
Crimped exhaust duct stopping the fan venting condensation properly, found during a pre-handover inspection in Tarneit
Crimped exhaust duct stopping the fan venting condensation properly
Open gaps left where mouldings meet the wall and ceiling, found during a pre-handover inspection in Tarneit
Open gaps left where mouldings meet the wall and ceiling
Gap between window and cladding too wide for the flashing to cover, found during a pre-handover inspection in Tarneit
Gap between window and cladding too wide for the flashing to cover
Door to frame gap outside the allowed 2mm to 5mm range, found during a pre-handover inspection in Tarneit
Door to frame gap outside the allowed 2mm to 5mm range
Chipped and damaged concrete floor at handover, found during a pre-handover inspection in Tarneit
Chipped and damaged concrete floor at handover
Cracked eave linings needing repair before handover, found during a pre-handover inspection in Tarneit
Cracked eave linings needing repair before handover
The Owner Inspections inspection team
Why Tarneit owners choose us

Independent. Licensed. Insured.

  • Registered practitioners, fully insured, ASBC and BDPS members
  • Photo of every defect and the standard it fails
  • Thermal camera, moisture meter and drone where needed
  • Report within 24 hours
Guides

Pre-Handover (PCI) Inspections guides for Tarneit

All guides →

Book pre-handover (pci) inspections in Tarneit

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-Handover (PCI) Inspections in Tarneit: common questions

When should I book a PCI inspection in Tarneit?

As soon as the builder gives a practical completion date, ideally 3 to 5 days before the builder's own walk-through.

What is not included in a PCI inspection?

We check fittings visually and by hand. We do not energise or test electrical circuits, pressure test plumbing or gas, commission heating and cooling, or flood test wet areas unless that is booked separately. Compliance certification and the occupancy permit are the building surveyor's role, and structural certification is an engineer's. Work already concealed by linings, render or tiling cannot be assessed, and anything incomplete on the day is listed as incomplete.

Do you reinspect after the builder fixes the PCI list?

Yes. A reinspection confirms each item before you settle and take the keys.

How many defects does a Tarneit PCI usually find?

Between 40 and 120 items on a standard volume build. Most are finishing defects, and a handful are usually worth escalating.

How much does a PCI inspection cost in Tarneit?

It depends on the size of the home and whether thermal imaging or a drone is included. Use the quote form for an instant price.

What is the difference between PCI and a handover inspection?

They are the same inspection. Practical completion inspection (PCI) is the contract term; handover inspection is what most owners call it.

Can I refuse to settle if defects are found?

Most Victorian contracts let the builder call practical completion with minor defects outstanding, but you can insist on a written list with fix dates and have them recorded on the handover form.

Do you attend the builder's handover walk-through?

We inspect separately, usually three to five days earlier, so you walk in with the list already in hand. You are welcome to attend our inspection.

What if I have already taken the keys?

You still have the defects liability period. A defect investigation report documents the items and the standard each one fails.

CallGet a Free Quote