When to book each stage inspection on a Tarneit build
Slab, frame, lock-up, fixing and PCI: the right moment to inspect each stage and what is lost if you miss it.
Practical completion is the last point where the builder must fix defects before you take the keys and your defects liability period starts. Tarneit PCI reports typically run 40 to 120 items.
Volume builders finish Tarneit homes quickly, so the finishing trades are where most defects sit: ridge capping, gutters and valleys, brick staining, thresholds, render cracking, cabinetry and silicone. A numbered, photographed list turns the handover walk into a checklist instead of a negotiation.



Annotated findings from Pre-handover (PCI) inspections on Tarneit builds. Client addresses withheld.





1Bored piersAfter the piers are drilled and steel is placed, before concrete
2Slab pre-pourThe day before the concrete pour
3FrameAfter roof trusses are on, before wrap, sarking and roof cladding
4Lock-up (pre-plaster)After brickwork, windows and roof are on, before plasterboard
5FixingAfter plaster, doors and cabinetry are in, before paint
6WaterproofingAfter the waterproofer finishes, before the tiler starts
Slab, frame, lock-up, fixing and PCI: the right moment to inspect each stage and what is lost if you miss it.

Straightness, bracing, tie-downs, lintels and openings. The frame stage is the last time the structure is fully visible.

Flashings, wall wrap, brick ties and mortar joints at lock-up. Membranes, upturns and falls before tiling. Two checks that prevent most water problems.
Instant online pricing, or talk to the booking team on 1300 471 805.
Between 40 and 120 items on a standard volume build. Most are finishing defects and a handful are usually worth escalating.
Yes. A reinspection confirms each item before you settle and take the keys.
Yes if you can. We walk you through the list on site so you know what to hold the builder to.
Between 40 and 120 on a standard volume build. Most are finishing defects.
Yes. It confirms what was actually fixed rather than patched, before you settle.
We prefer three to five days earlier so the list is with the supervisor before the meeting.