Fixing inspection in Tarneit

Fixing is when plaster, doors, architraves, skirtings and cabinetry are installed and before painting starts. Items found now are corrected before paint covers them.

  • After plaster, doors and cabinetry are in, before paint
  • 1 to 2 hours on site
  • Report within 24 hours
Get your Tarneit inspection priceInstant price. No obligation. Same-week bookings.

Fully licensed & accredited

Stage5 of 7
When to bookAfter plaster, doors and cabinetry are in, before paint
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the VBA Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Tarneit fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Tarneit builds

Tarneit's volume builders run finishing trades quickly. Bowed walls, misaligned cabinetry, doors that bind and plaster joints visible in natural light are the fixing findings we record most, and each is far cheaper to fix before the painters arrive.

What we find at this stage in Tarneit

  • Walls bowed beyond the 5 mm over 1.8 m tolerance
  • Cabinetry out of level or doors misaligned
  • Plaster joints and cornices visible in natural light
  • Doors binding or gaps outside tolerance
  • Tiling set-out and lippage before grouting
Mortar blown out of the joints and needing refilling, Tarneit
Mortar blown out of the joints and needing refilling
Additional fixings needed to secure the work, Tarneit
Additional fixings needed to secure the work
Doors and drawers needing adjustment to run smoothly, Tarneit
Doors and drawers needing adjustment to run smoothly
Sample findings

Sample defects found during our fixing inspections in Tarneit

Annotated findings from Fixing inspections on Tarneit builds. Client addresses withheld.

Sarking not lapped into the gutter, the likely source of a bedroom leak, found during a fixing inspection in Tarneit
Sarking not lapped into the gutter, the likely source of a bedroom leak
Window flashing not seated between the window and cladding, found during a fixing inspection in Tarneit
Window flashing not seated between the window and cladding
Blocked and broken stormwater pipe found on site, found during a fixing inspection in Tarneit
Blocked and broken stormwater pipe found on site
Brickwork still to be washed down to remove mortar staining, found during a fixing inspection in Tarneit
Brickwork still to be washed down to remove mortar staining
Window flashing and trims not sitting correctly against the cladding, found during a fixing inspection in Tarneit
Window flashing and trims not sitting correctly against the cladding

The other stages of a Tarneit build

  1. Bored piers inspection in Tarneit1Bored piersAfter the piers are drilled and steel is placed, before concrete
  2. Slab pre-pour inspection in Tarneit2Slab pre-pourThe day before the concrete pour
  3. Frame inspection in Tarneit3FrameAfter roof trusses are on, before wrap, sarking and roof cladding
  4. Lock-up (pre-plaster) inspection in Tarneit4Lock-up (pre-plaster)After brickwork, windows and roof are on, before plasterboard
  5. Waterproofing inspection in Tarneit6WaterproofingAfter the waterproofer finishes, before the tiler starts
  6. Pre-handover (PCI) inspection in Tarneit7Pre-handover (PCI)At practical completion, three to five days before the builder's walk-through

All construction stage inspections in Tarneit →

Guides

Construction stage guides for Tarneit

All guides →

Book a fixing inspection in Tarneit

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Tarneit: common questions

What is the difference between fixing and PCI?

Fixing looks at the finishing trades before paint, so items can be corrected cheaply. PCI is the final list at practical completion, before you take the keys.

Do you check the kitchen at fixing?

Yes. Cabinetry level and alignment, benchtop junctions and appliance provisions are checked before paint and splashbacks go in.

Is waterproofing checked at fixing?

No. Waterproofing has its own inspection before the tiler starts, because the membrane is covered once tiling begins.